Alliance Logo
Alliance
Engineering Group

 

Capabilities
 
Projects
Bemax Mineral seperation plant
Bemax Dredge
Far west Regional Head Frame
Aquatic Centre
Perilya Tank Cell
National Rail Truck Reconditioning
Broken Hill Hospital
 
Services
 
Expertise
 
Contact us
 
Home

 

 

 

 

 

 

 

 

Projects

BEMAX mineral Seperation Plant

Client:

Ausenco Limited
Project:
Bemax Resources
Description:
Fabrication and installation of plant and equipment for Mineral Separation Plant

Alliance Engineering Group completed the work at the Bemax Resources mineral seperation plant in March 2006. Alliance Engineering Group completed the project within 4 months with 30 staff working on site at any one time.

Alliance Engineering Group manufactured and installed in the the following:

  • Mineral seperation plantSurge Tank, Sand Trap and supporting structure.
  • Shaker screen support structure.
  • Fabrication and installation of all carbon steel pipe work through out the plant.
  • Installation of pumps, valves, pipe supports, pipes, ring mains and manifolds.
  • Installation and splicing of all 7 conveyor belt.
  • Manufacture and supply of feeder conveyors .
  • Installation of drier and exhaust stacks.
  • Grit blasting and painting of 40 tonnes of structural steel.
  • Numerous walkways, stairs and handrail throughout the plant.
  • Fire fighting and pump systems, fire piping system.
Home | Capabilities | Projects | Services | Expertise | Contact us
©2006 Alliance Engineering Group.

Website by
amuzemedia website design