Projects

BEMAX mining dredge

Client:

Basin Sands Logistics
Project:
Bemax Resources
Description: Overhaul of 1100t spare mining dredge.

Alliance Engineering Group completed the works of the Bemax Resources Mining Dredge in November 2005. Alliance completed the project within 7 months with over 50 staff working on the project at any one time.
The project involved a complete overhaul of 1100 tonne mining dredge in Broken Hill.
The project involved the following work:

  • Overhall of DredgeRepair of damaged Bow pontoon sections from a previous operation
  • Extension to the two Bow Pontoons to incorporate the new design
  • Extension to cutting head boom (ladder) to incorporate the new design
  • Manufacture of new bearing / bushes, shafts, sleeves, and guide wheels for the spud carriage axles
  • Modification to spud carriage axle.
  • Extension of the 40m Spuds to incorporate the new design .
  • Refurbish and modify 145 Floatline Pontoons to the new design.
  • Grit Blast and Paint all surface internal and external surfaces of the dredge up to 520 micron
  • Refit the hydraulic room onto the centre cross of the dredge
  • Assist in the final assembly operation at the mine site
  • Manufacture and supply pontoons for the concentrator